Sprayscape
BEFORE YOU PLAN YOUR FIELD TRIP
CLICK HERE
TO VIEW THE BUS POLICY FOR
PLYMOUTH TOWNSHIP PARKS
If you’re looking for a place to cool off this summer
venture out to Township Park and take a run through our new Sprayscape!
Township Park is located at 46640 Ann Arbor Trail, just east
of Beck Road.
Sprayscape
ribbon-cutting ceremony photos and dedication remarks.
Photos of Sprayscape
Construction
The sprayscape is open to all park patrons Saturday, May
24, 2008 through Tuesday, September 30, 2008. Daily operating
hours for the sprayscape are 10:00 am until one hour before
Park closing.
The Sprayscape includes approximately 2600 square foot of space with 24
spray features including:
- Water Cannons
- Horse Charger
- Froggy-O
- Daisy Mae
- Water O’s
- 12 ground sprays
The Sprayscape is designed to accommodate all ages and will
be available at no cost!
Sprayscape Rules and Regulations are posted at the sprayscape
and designed to ensure the safety of all citizens using the
park.
Sprayscape Rules
and Regulations
| 1. |
Sprayscape is an unsupervised area. |
| 2. |
Adult supervision is recommended |
| 3. |
Footwear is recommended |
| 4. |
Climbing on the structures is strictly
prohibited |
| 5. |
NO skateboards, in-line skates or bicycles
are allowed in spray area |
| 6. |
Please no glass in this area for your
safety and the safety of others |

Sprayscape Concept Drawing
Sprayscape
Construction Progress

July 4, 2002

July 4, 2002

July 16, 2002
The underground vault to house electrical and valve mechanisms
for the sprayscape has been installed.

July 16, 2002
Final grading for the ice skating rink area is nearly
completed.

July 29, 2002
Footing Installations for Sprayscape components.

August 6, 2002
Spray device water system piping installation in progress.

August 6, 2002
Water system vacuum breaker installed;
2" water service connection complete.


August 13, 2002
Installation of Sprayscape components is underway.

August 13, 2002
Wood forms for concrete sidewalk pouring being constructed.
August 19, 2002
Forms and stone base preparation for concrete sidewalk.

August 19, 2002
Spray devices with water line piping being connected.

August 19, 2002
Spray devices installed

August 26, 2002
Fence posts for wrought iron style fence have been installed.

August 26, 2002
Concrete pad for bicycle racks is being formed.

August 26, 2002
Stone base material is being spread for
concrete installation in spray pad area.


September 4, 2002
Spray devices and fence posts have been installed and
perimeter concrete walkway has been poured.

September 4, 2002
Interior area has stone base compacted in preparation for
concrete and rubber surfacing installation.

September 9, 2002
Concrete installation is complete, center area being prepared
for application of rubber safety surfacing.

September 9, 2002
Evergreen trees being planted as future Winter
wind break/buffer around skating area.
|